Chaumont Bridge Project
Starting at 8am on Thursday, December 1st, the NY Route 12E Bridge over the Chaumont River will be reduced to one-way alternating traffic controlled by traffic signals. The new bridge will be constructed in 2 stages; therefore, the traffic pattern is expected to remain in effect until fall 2024. During construction, pedestrian traffic will be maintained utilizing a sidewalk across the bridge. Due to the new traffic pattern, minor delays may be encountered especially during periods with high traffic volumes.